
TEXARKANA — The Texas Department of Transportation’s (TXDOT) widening of Interstate 30 from FM-989 (Summerhill Road) to State Line Avenue continues in Texarkana.
On I-30, daytime work is ongoing in the median, and drivers should watch for trucks and equipment pulling onto I-30.
For Bowie County, this is one of three TXDOT projects in the county. The other two projects are bridge replacement over the Sulphur River at the Bowie-Cass County line on State Highway 8, and the replacement of a bridge over Anderson Creek on State Highway 98.
At Anderson Creek on SH-98, traffic is restricted to one lane with signal lights controlling traffic through work zone.
Along with bridge replacement over the Sulphur River, in Cass County, on U.S.-59, from 1.5 miles south of State Highway 155 to the Marion County line includes the installation of a safety barrier cable with daily lane closures. There is also the widening of a bridge at Jennings Slough on U.S.-67 with signal lights controlling one-way traffic.

Here is a list of other roadwork throughout the TXDOT-Atlanta district:
Camp County
SL 255 – From FM 1520 to US 271, constructing highway. County Road 2120 detoured
Harrison County
- I-20 – At US 59 overpass, replacing bridge. US 59 traffic shifted to southbound lanes
- I-20 – At Lansing Switch Road, constructing new bridge over interstate. Lansing Switch Road closed to through traffic. Possible lane closures on I-20
- SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Northbound lanes closed with signal lights controlling one-way traffic
Marion County
- US 59 – From SH 49 to two miles north of SH 49, repairing and resurfacing highway. Various lane closures
- US 59 – From Cass County line to 2 miles north of SH 49, installing safety barrier cable. Daily lane closures
Morris County
- SH 49 – From Titus County line to FM 144, repairing and resurfacing highway. One-lane, two-way traffic
Panola County
- US 59 (Loop) – From Business 59 North of Carthage to US 79 East, rehabilitating highway. Traffic detoured to ramps on eastbound/westbound Loop 59/79. Business 59 open to traffic
- US 79 — From SH 149 to Rusk County line, rehabilitating highway
- SH 149 – From US 79 to .8 miles south of SH 315. Various lane closures on Loop 149 during final phase
Titus County
- SH 49 – From FM 1735 to Morris County line, repairing and resurfacing highway. One-lane, two-way traffic
- SH 49 – From Business 271 to Mount Pleasant city limits, repairing and resurfacing highway. One-lane, two-way traffic
- CR 4550 – At Hart’s Creek, replacing bridge. CR 4550 closed to traffic
- US 271 – At Dickson Creek, Big Slough Creek, White Oak Creek & White Oak Creek Relief. Replacing bridges