TXDOT continues to widen I-30 westbound from Summerhill Road to State Line Avenue

Contact us:

3446 Summerhill Road
Texarkana TX 75503
903-255-7935
info@foxsportstexarkana.com

TXDOT

TEXARKANA — The Texas Department of Transportation (TXDOT) is still continuing the widening of Interstate 30 (Summerhill Road) to State Line Avenue in Texarkana.

On I-30, daytime work is ongoing in the median, and drivers should watch for trucks and equipment pulling onto I-30.

Throughout the rest of Bowie County, there are two other projects: the replacement of a bridge over Anderson Creek on State Highway 98 and bridge replacement over the Sulphur River at the Bowie-Cass County line on State Highway 8.

For Cass County, the only other TXDOT project is the widening of a bridge at Jennings Slough on U.S.-67 with signal lights controlling one-way traffic.

Ben Scharnberg
https://www.longviewnissan.com

Here is a list of other roadwork throughout the TXDOT-Atlanta district:

Camp County

SL 255 – From FM 1520 to US 271, constructing highway. County Road 2120 detoured

Harrison County

  • I-20 – At US 59 overpass, replacing bridge. US 59 traffic shifted to southbound lanes
  • I-20 – At Lansing Switch Road, constructing new bridge over interstate. Lansing Switch Road closed to through traffic. Possible lane closures on I-20
  • SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Northbound lanes closed with signal lights controlling one-way traffic
  • US 80 – From Loop 390 to Interstate 20, resurfacing highway. Possible lane closures

 Marion County

  • US 59 – From SH 49 to two miles north of SH 49, repairing and resurfacing highway. Lane closures, expect delays
  • US 59 – From Cass County line to 2 miles north of SH 49, installing safety barrier cable. Daily lane closures

 Morris County

  • SH 49 – From Titus County line to FM 144, repairing and resurfacing highway. One-lane, two-way traffic

 Panola County

  • US 59 (Loop) – From Business 59 North of Carthage to US 79 East, rehabilitating highway. Traffic detoured to ramps on eastbound/westbound Loop 59/79. Business 59 open to traffic
  • US 79  — From SH 149 to Rusk County line, rehabilitating highway
  • SH 149 – From US 79 to .8 miles south of SH 315. Lane closures possible during final phase

Titus County 

  • SH 49 – From FM 1735 to Morris County line, repairing and resurfacing highway. One-lane, two-way traffic
  • SH 49 – From Business 271 to Mount Pleasant city limits, repairing and resurfacing highway. One-lane, two-way traffic
  • US 271 – At Dickson Creek, Big Slough Creek, White Oak Creek & White Oak Creek Relief. Replacing bridges

 Upshur County

  • US 271 – From 5.9 miles north of SH 155 to 1.5 miles north of SH 155. Resurfacing highway